
Work Breakdown Structure
The Work Breakdown Structure (WBS) documents the subdivision of tasks and effort required to complete an objective or project. It is most often depicted as a tree structure where high level tasks break down into lower level tasks. Low level tasks are typically grouped in various logical ways such as by system, subsystems, project phase, or a combination of these.

 
					


 Login with Google
Login with Google